B Gateway Warehouse Installation
Tutorial to walk you through B Gateway installation in a warehouse environment.
Follow these steps for your warehouse installation of the B Gateway:
- Find a position for your gateway at least six feet off the ground (the higher the position, the better the signal will be).
- If you are using zip ties, attach the gateway with at least three zip ties, ensuring they are securely fastened.
- Cut the ends of the zip ties.
- Attach the power harness cable to the gateway cable.
- Zip-tie the cable to secure it in place.
- Cut the ends of the zip ties and plug in the gateway to connect and power up the device.
- If you are screwing your gateway into the wall, use at least three 3-quarter-inch self-tapping screws for stability.
- Connect the power harness cable to the gateway cable.
- Zip-tie the cable securely (be sure to cut the ends of the zip ties).
- Plugin the power source and verify the gateway has pow